I have a DOE where I've blocked runs by month - I can run 4 runs/month, for a total of 12 runs over 3 months.
Is there a way to salvage my design if 1 of the runs in a block fails due to outside circumstances unrelated to the DOE factors?
For example, run number 4 in my 1st block of experiments had to be stopped half way through due to a raw material supplier issue, so that block only has 3 runs completed. Is there a way to re-tool the DOE so the 1st block has only 3 runs, the second block has 4 runs, and the third block has 4 runs, or should I just start over (would set me back a month or so)?
What if I can run a 3 run block, a 5 run block, then a 4 run block instead? Just curious what people would do in this situation, and how do I leverage data from those 3 completed runs without having to start from scratch- should I look at paring down the number of factors, and just do blocks of 3 runs with less factors etc...?