I have a doubt about the LPP problem.
I go for DOE-> Custom Design
Here I define our Objective
Z= Maximum or Minimum
Then I define and depend on factors and their variable type and range (Say X1 and X2)
Then i define constraints
Then I select the number of runs (default or user define)
Then Make Design-> Make Table
Data options for X1 and X2 values are already fixed in this phase
The formula of our moto i.e. Z=X1 +X2 or X1-X2 or X1*X2 or many other possibilities for formula are still not defined in JMP till time.
Then how will the JMP be able to get the optimum value according to the formula?
I am facing same issue in a problem. I am getting only extreme values of dataset, but optimum value lies in between.