19.0.3: approved emergency fixes till 11/27/25, security fixes till 12/4/25 • 19.1: all changes require code review – approval begins 12/11 • 20.0: open in main • 20 EA1: 1/22/26
Welcome to the JMP Development Update for November 14, 2025!
The JMP web QA team has signed off on the JMP Live 19.0.2 security update. With all required 19.0.2 signoffs now complete, and the security bulletin for this update prepared, we look forward to its release in MyJMP next week! In addition, the JMP 19.0.3 security update and emergency bug fix track is now open. A list of approved fixes can be found here.
As we head towards the start of Approval Mode for JMP 19.1 on 12/11/25, please continue to triage your items with Planned Version = 19.1. Here is a report of JMP 19.1 Bugs in Initiated and Developing status with ~200 items left. Bugs should be fixed in 20, tested, and integrated into 19.1. If a fix has already been tested in 20.0, please integrate into 19.1 as soon as possible so final verification can be done sooner rather than later.
Thanks to the JMP DevSecOps team for presenting at Thursday’s dev meeting. The team shared about JMP’s security strategy, recent process improvements, updates to security scanning, and more. Big thanks to Travis LaPolla, Shannon Leslie, and Nick Ruva from JMP Development and Keegan Walker from Digital Operations for presenting at this session! If you missed the meeting, you can find a recording here.
Thanks also to Shannon L for sharing the November 11, 2025, product changes for Atlassian products!
On November 11, Atlassian rolled out changes to our Jira and Confluence Cloud sites. A list of relevant changes along with highlighted details and documentation can be found here.
The changes include:
- Syntax highlighting for code blocks in Jira description and comments
- Fixing JQL query errors using AI generally available
Contact Shannon Leslie or any of the other JMP Atlassian admins with questions. Also check out our JMP Atlassian Q&A Teams channel, where this and other Atlassian information will continue to be shared.
General Announcements
Important Upcoming Dates
- JMP 19.0.3 Approved Emergency Bug Fix Freeze – 11/27/25
- JMP 19.0.3 Security Freeze – 12/4/25
- JMP 19.1 Code Approval Mode - 12/11/25
- JMP 19.1 Code Freeze – 1/5/26
- JMP 19.1 Security Freeze – 2/19/26
- Please visit Confluence for a full list JMP 19 dates.
JMP Development Updates
Statistics
- John Sall
- In Process Screening I removed the "Launch for Selected" submenu that launched Control Chart Builder and Process Capability. Control Chart Builder is still scriptable for compatibility but Process Screening has full featured Control Charts within it. A new command "Capability Details for Selected" embeds a Capability report - the same one that CCB uses, and the old "Process Capability" becomes an alias for this command.
- Also in Process Screening with spec limits is the new command "Save Out-of-Spec Column" that creates a formula multiple-response column showing all the columns and grouping levels for each row that has an out-of-spec condition. To make this feature avoid too many delimiters, the "Concat Items" builtin function now has a "Suppress Empty Strings" optional third argument.

- Laura C-S: Continued fixing several bugs in SEM related to the higher-order models with the new estimator (MIIV-2SLS). Responded to three inquires --from tech support and from a couple SEM users--about various SEM topics. Watched hireview videos from the testing applicants to provide feedback. Met with Haley to discuss polychoric correlation work. Reviewed patent claims paperwork.
Stat Documentation
- Michael C: Participated in interview panels for Research Statistician Tester role. Reviewed candidates for summer internships. Started learning about equations in Oxygen. Started work on updating bulleted lists in the documentation to better align with our documentation style guidelines.
Stat Testing
- Mark: Studying Hasse diagrams to prepare for a new design method. I prepared with Jacob to present our Developer Tutorial about simulation with JMP today. I updated the unit test script for the Data Entry tab in Easy DOE to use a new strength = 3 blocked covering array that spreads the test cases over 5 testing days. I reviewed allowed claims for a patent for the automated usability study tool. I started writing a new unit test script for the model fitting aspect of the Bayesian Optimization platform based on generating many cases using a covering array and comparing to historical predictions from known fits.
- Tonya: Testing new features in Process Screening. Rewriting unit tests due to drawing order and line seg description changes in MSA. Rewriting unit tests due to Process Screening changes to capability analysis. Attended a Service Cloud meeting and reviewed changes that are coming in Service Cloud. Bug verification.
- Jacob: Presented a Tutorial on Simulate Responses in DOE, with Mark Bailey. Assisted with the interview panels for the open Stat Testing positions. Revised Easy DOE unit tests. Worked on new unit tests for Fit Two-Level Screening.
Life Sciences Updates
- Drew: Finalized IQ and OQ PDF generation add-ins as per marketing request - JMP-26364. JMP Clinical 19.1 and 20.0 Jiras. Continued work on scripts for gathering metadata from folders of study in the hopes that we crowd-source gather content to help train models for aiding users in mapping raw data into CDISC structures.
Product Management and Product Marketing
- Bryan: Deployed translated versions of the JMP Lab tests for the Assistant and Dynamic Sorting for JMP Discovery Summit Korea (last week, translations were deployed in Japan). Contributed to a JMP Live string review and a design meeting for creating a configurable JMP report on JMP Live. Began a course by W3C called Introduction to Web Accessibility. Participated in meeting regarding testing of ongoing accessibility work. Obtained access to JAWS for accessibility testing purposes. Developed icons for JMP Clinical. Created JMP 20 installer splash screens for JMP, JMP EA, JMP Pro, JMP Pro EA, JMP Student Edition EA, JMP Clinical, JMP Clinical EA and JMP Pro for JMP Live.


Technical Support and Engagement
Technical Support Case Volume by week:

Case Topics for Technical Support queue, last week:

Engagement Support Case Volume by week:

Case Topics for Engagement queue, last week – excluding Restricted Party Screening:

Development Operations
- Jim:
- Branched 19.0.1 into 19.0.3; built 19.0.3 on mac OS and WinOS; built mac OS installers for the four JMP products. Completed multiple branching tasks (ie, JIRAs) for new processes. Created Jenkins projects for JMP Pro 19.0.3 daily unit test runs on mac OS and WinOS. Archived many older Jenkins projects
- Thanks to Nick Ruva for dedicated time to resolve automated unit test runs
- Modifying daily unit test scripts to differentiate between AMD64 and ARM64
- Perforce support.
- Shannon L: Spoke in Thursday's DevSecOps JMP DevDemo on several recent and upcoming security initiatives from the Security team, including Monthly security releases, Jira issue-level security, Security bulletins, and R&D access management for IP protection. End-of-cycle 19.0.2 tasks, including PLSR and created the security bulletin. Curated a list of interesting Jira and Confluence updates from our last monthly rolling update from Atlassian. Weekly technical meetings. Oxygen migration meetings and planning. Continued program work for JMP Marketplace Monetization platform, with meetings with Finance and JMP Store.
- Bob:
- Altered registry for installers – JMP-28459.
- Created and tested new installers for 19.0.3 – JMPTOOL-1853
- Removed JMP/JMP Pro/JMP Clinical installers for 19.0.2 from OneDrive and other areas after decision to only release JMP Live 19.0.2, containing JMP Pro Live from 19.0.1
- Tweaked log files with overnight installer process
- Added Visual C++ Redistributable to Extra folder on Windows installations for easy user access, if needed – JMP28704
- Edited JMP Pro Live installer scripts to allow for differing release areas for maximum flexibility JMP Pro Live, Keycloak, JMP Live, JMP Live Database
- Eorked with Hunter and CloudGiants to review updates on MyJMP for V20 EA
Localization
- Krzysztof: Finishing testing of new commit and return processes for Builtins and SampleData. Helping vendors and reviewers with memoQweb interface questions and issues. Working on a proposal for improving future (Oxygen) folder structure and branching for better integration of translatable source and localizations. Fixed two DOE Sample tables for 19.1.
- Allison: Pre-processed and handed off 19.1 Portable UI translation kits to our vendors; delivered translations of Marketplace strings for all languages; worked with vendors, procurement, and legal on multiple PO, change orders, and WO requests; investigated and responded to translation queries on Portable UI and JMP documentations.
- Sandy: More development/testing on new return job for Sample Data. Enhanced program run after new commit job to change Sample Data needs-review states to new.
- Sohail: Script to build multilingual files, added test cases for all functions, cleaned up import errors, testing cheaper model for term explanations and extraction.
Documentation
- Qiana: Reviewed resumes and HireVue videos for summer interns. Created sample Oxygen files for L10N to test. Peer reviewed JMPDOC-2655. Sample data work. Began the procurement process for MathType software. Worked on procurement process for Ryffine (Oxygen training). JMP 19.1 project planning.
- Susan C:
- Working on JMP Live resolved bugs for 19.1. Watched & attended JMP Live demos. Continuing work on JMP Live for SPC guide. Planning dates for JMP Live 19.1
- Started work on presentation for testing
- Updating peer review page in Confluence for JMP Live
- Devon: Continued work on JSL Scripting Reference book FM > XML conversion, 19.1 help key updates in UG and JSR, JMPTOOL-1731: Looking at P4V folder labeling issues.
- Jill: Reviewed and closed several UG Jira issues. Reviewed the 11/9 UI strings.
System/Host Testing-Cary
- Hunter: Working through some of the test failures on arm64 JMP 20. Participated in training session with the new members of our host testing group. Attended meeting with Holly Cullen and Bob Hickey about testing updates to the Early Adopter download pages in My JMP. JIRA Verifications.
- Nick H: Fixed an issue where the test run history graphs in the dashboard were drawing outside the graph. This was due to timezone discrepancies between postgres server and the dashboard. Helped the new testers on our team learn the testing framework and nightly reporting processes. Fixed a number of failing unit tests in JMP 20. Lastly I worked on both 19.1 and 20.0 verifications.
- Justin Kusch: Finished setting up my environment for testing and continued with onboarding training sessions. In addition, I’ve worked on closing defects associated with the 19.1 MATLAB connectivity and started work on testing for the python integration bug fix in 19.0.3.
- Mandy: Worked on tests this week, moving some tabulate tests from various other tests into another test for tabulate area. Worked with new employee going over a JIRA entry and testing things in 18, 19, 20 for comparison.
- Audrey: training for new staff (who are doing great!), interviewing interns for next summer, still working out responsibilities for all test items.
- Lisa: Provided an introduction to jmprunner session for our testing team, verified some sample data tickets, and updated some failing JSL tests.
Core
- Evan: Further keyboard navigation, focus indicator, and other accessibility changes for TabPage and ListBoxBox. Added image test support in test/Mimic. Exposed button roles to JSL and making button role improvements to New Window.
- Dave B: Working on adding arm64 change list builds to jmprunner. Debugging noisy html image test results. Fixed a problem with mfi and encrypted scripts.
- Xan: Bug work: SVG export, regex crash, ref line label drawing. Wasted a day trying a JSL performance idea.
DOE and Reliability
- Caleb: Working on consolidating some functions in the sample size explorers. Should make it easier to convert the remaining explorers and add new ones in the future.
Hosting and Interfaces
- John Schroedl: More accessibility work related to edit box, menus and setting labeled-by values in Preferences. Met with Melisa Turner and others to discuss accessibility testing directions. Had a call with some members of the DOE team to give a whirlwind intro to Visual Studio. My notes FWIW are here and linked off the Setting Up a Development PC confluence page. Happy to clarify any items that don't make sense outside of the call. Efforts to renew Telerik license continue. Vetting the new VS 2026 release.
- Paul N:
- JMP-28319 - Security update of Python to 3.13.9 and performance fix for updating large data table column from Python with construct like dt[ ’age’ ] = [ long_list_data_here ]
- Setting up Windows Arm64 laptop
- Tracking down signing issue on JMP 19.1
- Tested build upgrading macOS minimum system requirements to macOS 14.6
- Lots of deprecations with BLAS and LAPACK in favor of new BLAS and LAPACK functions
- Some Metal deprecations in favor of newer or updated APIs
Interactive HTML
- Paul Spychala: New feature development has continued for 20. This includes rounding out vertically collapsible outline boxes support across all major browsers and the beginning of writing a new platform (to be announced at a later time).
Note from Shannon
Thinking ahead to the Thanksgiving holiday the week after next, I came across this infographic about favorite pies for this time of year! I don’t have the data, but maybe someone can turn it up and make a JMP version. :smiling_face_with_smiling_eyes:

I grew up in the state just north of PA, but I had to look this one up! No matter what holiday dessert you enjoy most, hope you have a great holiday break!