X axis for Control Chart Builder JMP 19
When I use the control chart builder in JMP 19, the X axis is not adjusting to the correct order. I even tried Value order on and off and it does not make a difference

Why isn't the x axis changing to the correct order? I am on a MacBook, but it also does it on Windows.
Quality and Process EngineeringRe: X axis for Control Chart Builder JMP 19Seems like you have to enable Sort by Subgroup in JMP19

Re: X axis for Control Chart Builder JMP 19Thank you! I found it in preferences. I have used JMP since JMP 4 and have never had to do this before.
Re: X axis for Control Chart Builder JMP 19Yeah, having to do this is a bit weird and it isn't the only change I would consider weird that came with JMP19.
Re: X axis for Control Chart Builder JMP 19Hey Lisa, was your data table sorted by "run order" when you did the MR, X chart?
I am saddened that the developers removed the "Legacy" control charts...being a user since JMP 1.
Re: X axis for Control Chart Builder JMP 19The legacy control charts are still there,. You have to call them using JSL.
names default to here(1);
dt= open("$SAMPLE_DATA/semiconductor capability.jmp");
dt << Control Chart( );