Hi all Jmp user and staff,
I would like to know, how to How to calculate control limit of Presummarize Charts?
I try to calculate by manual form table summary but the result not equal to the chart.
The formulas can be found in the documentation. In the JMP help facility, search for Control Limits for 3-way charts.