I am looking for advice on how to automate maximizing the desirability of a process profile when I am locking one of the factors and having the others optimize around it. My process has an uncontrolled factor, so I need to adapt to what it's doing per unit I measure. My desired response can generally be achieved by adjusting the controlled factors, but the desirability situation is unique per value of the uncontrolled factor.
Does anyone have a method or script I could use to feed JMP a column of this uncontrolled factor, and then adjacent columns that are the controlled factors will display their optimized value per row? It would be great if the estimated response was also a column in this table.