I am comparing sample (or "short term") capability vs overall (or "long term") capability for several processes for my data set (cannot share), using JMP. I find that for some processes, the overall Ppk is smaller than the lowest sample capability. To give an example with reference to the picture below, for some processes, JMP gives me a Ppk smaller than 1.33 which is lowest capability for a sample (blue distribution's below) for a given process. Intuitively, this does not make sense to me, but is this possible (mathematically?), if yes, under what circumstances? If not, where could I be going wrong with my JMP analysis?