Well, I must say, I am completely baffled as to how JMP is constructing the confidence band in the Actual by Predicted Plot. I have read all the statistical details. They claim that the Actual by Predicted Plot is actually a whole-model leverage plot, but I can construct nothing like it. When constructing the plot and confidence band, what exactly is L in the matrix equation

?
Normally, a leverage plot shows the residuals of all predictors but one against the residuals of the one parameter alone. But what could this possibly be when using the whole model against itself? The model without the mean vs. the mean? If so, the plot is not going to resemble an Actual by Predicted plot. Nor would the statistical details that follow for the confidence band make any sense. I also wonder if one can construct upper and lower prediction limits in a similar way.
I am using JMP 17.2.0. Thanks for any help.