Semiconductor CSV files adding wafer run orderHi
A lot of semiconductor equipment produces .csv files for data recorded during processing: a processed batch number containing 1 to X silicon wafers,
The tool will run same process steps repeating on up to X wafers. CSV file shows processed steps repeating but no assignment of the wafer run order. So if we have mutiple csv files imported to JMP then want a formula in the column to auto assign wafer run order; wafer run order will not always be same number of wafers that will vary...
Ideally a formula would be useful.....so we have batch number and process steps in CSV file.
Anyone done this...?.
BATCH NUMBER WAFER RUN ORDER PROCESS STEPS
Basic Data Analysis and ModelingRe: Semiconductor CSV files adding wafer run orderCould you provide small example of data to see what type of replicates there can possibly be (if there are none, simple Col Rank( ) might be enough or Col Cumulative Sum(1, )
Re: Semiconductor CSV files adding wafer run orderIf it would be possible to attach a sample of the excel file it would be very helpful in understanding your problem.
Re: Semiconductor CSV files adding wafer run orderSo attached a file where ive manually added wafer run order
Re: Semiconductor CSV files adding wafer run orderOne option could be something like this
Col Cumulative Sum(:Process Step == 1, :Batch Number)
but it does make some assumptions such as that your data is always in specific order and that new run order starts when Process Step changes to 1.