Hello,
I am dealing with 3 continuous independent variables (e.g. D,E,F) and 1 continuous dependent variable (e.g. X).
Some time (~1 year) ago, I was able to use JMP to generate a mathematical model of the form "X = c*D*E*F", where c is just a dimensionless constant. Presently, however, I am having trouble replicating that process in JMP 10; the 'closest' I have gotten so far by playing around with the "Fit Model" settings is "X = (D-d)(E-e)(F-f)", which is still quite different.
If anyone could help by directing me towards the correct method for generating a model of the form "X = c*D*E*F", I would greatly appreciate it.
Thanks!