I would like to connect two responses, initial and final, with a vertical line for each run. If possible, I would also love to display the difference value near the line. I have attached a picture of my graph and an example of what I would like (using powerpoint, I only did a subset of the data).
I would prefer an interactive explanation as I am not too familiar with JMP scripts. (but if I need a script that is ok too!)

