Hello, I am trying to model variable speed pool pump parameters: runtimes, speeds, and flow rates in order to minimize my power bill, but also achieve decent flow. I've hit a stumbling block with modeling the data.
Pump constraints: Max 24 hr run duration, Max of 3 speeds can be used per day, Speed increments are 2 hr blocks (0,2,4,6...24)
Example Pump Data:
RPM Flow Power
500 17 63
750 24 92
1000 29 132
1250 35 185
1500 41 260
1750 50 370
2000 57 515
2250 65 700
2500 75 926
2750 79 1210
3000 90 1540
3250 98 1920
3450 107 2290
What is the best way to model this in JMP 13? I