Process capability forecastHi,
I have calculated the process capability in JMP for this process with the mixture of 2 normals distribution. Our current ppk is 0,94. We plan to improve the measuring system cause it has currently a high variation. Now I want to explore how much improvement for the measuring system is needed (measuring system variation is actually 2.5).
Does anybody know how this simulation can be done in JMP?

Analytics