Hello,
I have an SPC data with UCL = 12.015 and LCL = 12 (target is 120.007) - see attached.
My OOC (Out Of Control) values are too high and I want to check that my sampling rate is correct.
Current sample rate is 0.1 (1 out of 10 parts are measured) and we are missing OOC measurements (there are 2 groups of SPC values with same limits: "Measure Depth 7" and "Measure Depth 1").
I tried using the sample size and power, but not sure which option to choose in the dialog box.
Thanks, Yoni