Using the design evaluation tool in JMP, I compared a Box-Behnken design with a Custom design (with 28 runs) to evaluate 5 factors with 3 levels each (see below):

Given the comparison, the custom design was chosen for the experimental runs. In the evaluation, I found the quadratic terms to be statistically significant (p<0.05) for one or more responses, despite the power for these terms being low as seen in the design evaluation table. In some cases, I do not find these to be practically significant with my knowledge of the process. Would the recommendation be to remove these terms from the model? What other metrics should be taken into account?