Hi JMP community,
I am currently working on a custom DOE design. Overall I have 3 factors with varying levels.
Stabilizer solution (I have 7 different stabilizer solution I would like to screen) + potentially adding a reference sample (no stabilizer added).
Dosage of stabilizer - 2 levels (high and low) => (0,01% and 0,02%)
Process (2 different heat treatments/autoclavations).
The pilot plant is able to mix 4 unique codes pr. day. (we have 4 days in the pilot plant booked). This means we can maximum mix 16 unique codes that can be run through both heat treatments (giving a total of 32 codes).
However the fact that we can only mix 4 codes pr. day and these need to be processed with both heat treatments (giving 8 codes pr. day) gives me some troubles. The ideal order will off course be so that:
Day 1:
Stabilizer 1: 0,01% - heat treatment 1
Stabilizer 4: 0,02% - heat treatment 1
Stabilizer 5: 0,01% - heat treatment 1
Stabilizer 6: 0,02% - heat treatment 1
Stabilizer 1: 0,01% - heat treatment 2
Stabilizer 4: 0,02% - heat treatment 2
Stabilizer 5: 0,01% - heat treatment 2
Stabilizer 6: 0,02% - heat treatment 2
etc...
However I can not get JMP to do this (have tried using blocking, and editing the "changes" from easy to hard etc.).
This best answer I got myself is attached.
I am not familiar with scripting (JSL), so those solutions will be hard for me. I am using JMP 17.
Thank you in advance.
Best regards
Kristian Bertelsen