Hi,
i would like to design DOE for the following situation:
The process has 3 steps.
option A - in step 1 prepare a small batch of 100g and continue with that to the next steps. each batch per one DOE run. this means that all the parameters would be easy to change
option B - in step 1 prepare a small batch of 500g and continue with 100g out of this Big batch to the next steps - this batch will last for 5 DOE runs. this means split plot design
in both cases, there is no way to check QC for the product of the first step.
please advise,
Thank You!