I need a little bit of statistics help. I've been working on a project that has yielded inconclusive results based on my sampling. My leadership team wants to press forward nonetheless and is planning to sample from the line at a set frequency to "Verify" what I could not on my own. I need help estimating the probability that they will find what I couldn't find based on their increased frequency.
Here are some specifics.
- What they are looking for –
- Falsely accepted product (Underweight food)
- Range of out of spec product - >0 and <36.4 grams
- Sampling frequency - 12 bars every 30 minutes
- Population frequency - 10,500 bars every 30 minutes
- Based on a stable normal distribution, I theorize about 1.03751% or 109 bars out of the 10,500 bars during that time period will fall within the out of spec category.
The hope is that by sampling at the frequency that production has chosen, if they aren't able to find any out of spec bars. That will then show that the improvement that I’ve been working on has not increased the risk of falsely accepted product through the measurement system. My feeling is that even after going through this study and perhaps not finding any defective bars, that they may not have found any defective product due to sampling size alone.
I have to imagine there is a statistic out there that can help me predict how many samples I would need to collect to find a defective product.