Hello Steering Committee,
A Poster presenter has indicated that they would be interested in receiving feedback from a Steering Committee member regarding their poster presentation.
I need a volunteer to review and mentor the Poster presenter regarding their presentation. If you are willing and able to volunteer please comment below and I will reach out to you directly and connect you with the presenter.
Presenter: André Zanezi
Company: WEG Electric Equipment
Title: Six Sigma Black Belt
Biography: André Caron Zanezi is a Global Six Sigma Team member at WEG. Six Sigma Black Belt and graduated in Electric Engineering with more than five years of experience in JMP use. At WEG he has implemented projects in areas such Product Development, Quality Engineering and Continuous Improvement providing him a Special Commend at 2019 BQF Lean Six Sigma Award.
Abstract Title: Accelerated life test development to demonstrate and quantify Washing Machine motors reliability
Abstract: Quality assurance and customer needs are rigorous terms that frequently refers to reliability. Improving products in terms of reliability challenge engineers in multiple ways: understanding cause and effect relationships, developing tests that reproduces customer conditions and properly generate reliable data without exceeding the product launch time deadline. Combining engineering expertise, historical data and lab resources, a Design of Experiment (DOE) was performed to quantify the product life time based on process, product and critical application variables. Performing several analyses using JMP tools, from DOE platform to the Reliability and Survival modules, the team was able to describe the product life time as a function of its critical factors. As result, an accelerated life test was stablished which is able to simulates years of product usage in just a few weeks, providing solid evidence of some specific failure modes. Standardizing its methods and procedures, the test became a crucial requirement to verify and validate new technologies implemented at WEG motors, optimizing the development process and reducing “time to market”.
Thank you,
Kirsten
Hi Kirsten,
I could give some advise to the presenter.
Best,
Björn