Hello,
i am wondering if it is possible to group runs into blocks after i have run all experiments in a DOE.
i would do this in the case that i can't control how many runs i am able to do per day (maybe due to random equipment downtime or other uncontrollable factors), and i would like to group runs done in a single day into blocks. typically, it seems like runs are grouped into blocks at the planning phase of the DOE, not after the DOE has been run, like i would like to do.
thanks!