Interactive Capability Plot - display Expected % Non-conformance (instead of, or as well as Expected PPM)For the interactive Capability Plot, it'd be great to show Expected % Out of Spec also. The Expected PPM may be useful for some, but for most people this is a value that needs re-calculation back to a real world metric, i.e. percentage.
Data Exploration and VisualizationMass CustomizationQuality and Process EngineeringRe: Interactive Capability Plot - display Expected % Non-conformance (instead of, or as well as Expected PPM)This could be expanded for all platforms which are missing this value.
I came across this topic Interactive Capability Plot - possible to convert PPM to % easily? which most likely did start this idea.
Definitely not the most elegant option but here is one way to script it:
Names Default To Here(1);
dt = Open("$SAMPLE_DATA/Semiconductor Capability.jmp");
obj = Process Capability(Process Variables(:PNP1), Individual Detail Reports(1));
obj << {:PNP1 << Process Capability Analysis(Interactive Capability Plot(1))};
tb = (((Report(obj)[OutlineBox("Interactive Capability Plot")][OutlineBox("New")][OutlineBox("Expected PPM")])) << child);
ncb = Number Col Box("Observed %", (tb[2] << get as matrix) / 1e6);
ncb << Set Format(Format("Percent", 7, 4));
Insert Into(tb, ncb);
// function for slider box
Eval(EvalExpr(
(((((Report(obj)[OutlineBox("Interactive Capability Plot")][OutlineBox("New")]) << child) << child)<< child)[2]) << Set Function(function({this},
Expr(ncb) << Set Values((Expr(tb[2]) << get as matrix) / 1e6);
));
));
// function for number edit box
Eval(EvalExpr(
(((((Report(obj)[OutlineBox("Interactive Capability Plot")][OutlineBox("New")]) << child) << child)<< child)[3]) << Set Function(function({this},
Expr(ncb) << Set Values((Expr(tb[2]) << get as matrix) / 1e6);
));
));
// tb[2] << Visibility("Collapse");
Reference building can be made cleaner if needed.
Re: Interactive Capability Plot - display Expected % Non-conformance (instead of, or as well as Expected PPM) - Status changed to: Yes, Stay Tuned!In the next release, Expected % and Expected Count have been added to the Interactive Capability Plot report, and the outline has been renamed "Nonconformance". The Expected Count is hidden by default.
Re: Interactive Capability Plot - display Expected % Non-conformance (instead of, or as well as Expected PPM) - Status changed to: DeliveredRe: Interactive Capability Plot - display Expected % Non-conformance (instead of, or as well as Expected PPM) - Status changed to: Delivered