Hello everyone,
This is my first post so I hope that my question is not found in other posts. If this is the case please guide me to the relevant post 
I saw in the "Optimal Design of Experiments - A Case Study Approach" book that in Chapter 4 the supplier of raw material, a categorical factor, is treated as a blocking factor for which interactions with the continuous main factors were accounted for. My question is: Why did they treat the supplier as a blocking factor rather than a normal categorical factor for which interactions with the continuous factors can also be specified, but in this case the variable would be randomized in the whole experiment. What would be the main differences? I understand that blocking is used for nuisance variables and that you should "Block what you can, randomize what you cannot" but is the supplier really a nuisance variable? The batch of raw material should also be treated as a nuisance variable?
This question is related to a DoE that I'd like to create. It should have 3 runs per day, 21 runs in total. My idea is to introduce a Random Block for Day to account for possible day-by-day variations. The experiment should be done with 3 batches of raw material. If I'd block, I should have 7 runs per batch for an I-Optimal Design, but in this case I'd change the lot in some days. Is there any problem that arises from such a design?
And another question that I have: how could I specify from the Custom Design that I want multiple random blocks? Should I create the design without the random block designation and change it to random block after the creation of the DoE?
Hopefully I stated my problem in a clear manner 