How do I view the script after Standardize date format of date column in data tables?Hello, I'm working on joining 2 data tables (import from Excel) to JMP to be only 1 table by using scripting. End result is I would like to build an automated report (.html) with running dates (increase) on x-axis. Since the format of the dates is not same between 2 data table after import from Excel (1 is text, another 1 is numeric), my graph not sorted correctly. I've standardized the dates column all to numeric manually by clicking at the column info. If I would like to view the script after changed the column info, where can I find it? Because, for graphs we can save the graph script into window. Btw, I'm using JMP 15 and still a newbie
ScriptingRe: How do I view the script after Standardize date format of date column in data tables?Hi
The script after changing the column information does not have the function of automatic recording and saving in the JMP15 version. For the specific method, you can search for the keywords "Data Type", "Modeling Type" and "Format" in the "Script Index". The syntax description of JSL is Example. (Starting with JMP16, all your operations will be recorded in the log. It is convenient for script recording during data cleaning)
Hope it can help you 

Re: How do I view the script after Standardize date format of date column in data tables?Thank you Frank.
Though I need to work on the column formatting scripting manually, I'm glad that JMP 16 has considered this.