Hello,
I am a JMP user and I have a doubt about
how JMP finds out the significance of the
effects in DOE after performing a D OPTIMAL
design.
If for instance I have a 16 run design and it turns out
that I can only perform 13, then I can use D-OPTIMAL
to find out which ones to skip.
The issue is that I don't know if the only way to
asses significance to the effects is using
a p-value through the ordinary least square
regression.
If that is the case I see it very simplistic,
since there are bayesian alternatives
to do that, more over we can estimate
the missing values.
I will really appreciate feedback on this topic.
Thanks.