Hello All.
In JMP, I work with stability data extracted from a LIMS system. When doing the analysis, I would have time in months on the X axis. The extracted data comes in two time “formats”: Either as time given in months (e.g. “M-12” or “M-36”) or as time given in days (e.g. “EOS-968” or “EOS-1011”). All data are located in the same column.
I need the data to be continues to be able to do the required analysis. Regarding time in months, I normally just remove the “M-“ by doing a “search and replace” – and leaving replace empty. It’s more work to change the days into months.
My own initial thought was to first remove the “EOS-“ part, then recalculate into months, but since the data are all located in the same column I’m finding it hard to keep the two “data sets” apart until they have the same unit.
Would you have any nice ideas on how I can more easily do this transformation? Maybe a small script is required?
Any help is greatly appreciated.
Best regards
Henriette