I am old school and believe that SQC is most effective when a physical control chart is in the hands of the operators of a plant. In this way, the operator documents the exceptional variation, the causes for the variation are therefore captured, and improvement can commence from the learning.
Has JMP solved the problem with implementing SQC electronically that still enables capturing (and learning from) assignable cause variation? I would prefer to use JMP for broad SQC implementation as my company has many JMP licenses.