All,
I am looking to see how you all might use JMP ro visualise the data below.
Each year shows the rolling total required.
For example, Role A adds 2 head in 2018, then 2 more (4 total) in 2019, then 4 more (8 total) in 2020 etc.
Role/Year | 2017 | 2018 | 2019 | 2020 | 2021 |
Role A | 0 | 2 | 4 | 8 | 16 |
Role B | 2 | 4 | 6 | 9 | 12 |
Role C | 1 | 4 | 6 | 8 | 10 |
Role D | 0 | 2 | 6 | 6 | 6 |
Role E | 0 | 2 | 3 | 4 | 5 |
Role F | 0 | 1 | 2 | 4 | 5 |
Role G | 0 | 2 | 4 | 4 | 4 |
I can make really basic visuals in ppt (see pic attached), but am looking for more snap.
Should I consider transposing data? Would it work well as a tree map...?
I am completly open to suggestions...