Hello,
I currently have a script that requires user input to define variables that are used to query a database and generate control charts. To eliminate the need for an operator to provide these inputs again to generate the control charts whenever new data is in the database, I would like to automatically update the control chart on a timed frequency. For example:
1. User provides input.
2. Initial database query.
3. Control Charts are generated.
4. Every two minutes, the database is queried and new data is added to the main data table.
5. New control charts are generated.
6. Repeat steps 4 & 5.
Thanks!