I was setting up a DOE with the factors and response from the 20 custom reactor sample files. Instead of going with the default of 20 runs, I was trying to show you could go down to a minimum of 16. When I clicked "Make Design", it instantly went to the page with the design evaluation. Normally, there is an algorithm that runs for about 10 seconds even when I go less than the default, so I thought that was weird. Then when I look at the color map on correlations, everything has an r of 0 (except of course along the diagonal), which does not seem real:

Anyone else getting something like this when going for the minimum amount of runs?