I am attempting to create a DOE with 2 factors we will call them configuration ( a 3 level categorical) and operator (also a 3 level categorical). I am trying to figure out a way in which JMP will allow me to create the DOE with a run order condition. The condition I need to set is that the same operator may not do two consecutive trials. I.e. Run 1 is Configuration 1, Operator 1 and Run 2 is Configuration 3, Operator 1 ; I have been told this cannot take place. I am unsure as to how I could go about controlling this or instilling a rule? Any input would be greatly appreciated. Thank you for your time.