Hello all,
I'm new to JMP (JMP15) and only familiar with limited analysis.
| | position | instant | 24h | 48h | 72h | 100h |
test A | A, B | Y | Y | Y | Y | Y |
| test B | A, B | Y | Y | Y | Y | Y |
| test C | A | Y | Y | Y | Y | NA |
To simply explain my dataset, with me have data at most time point. only test C didn't have 100h data. Test A and B had tested on both A&B position. Test C tested on A only.
The output from Fit model contains a lot Non-estimable. no results for all the items related to timepoint or position. Table and plot. How should I set in JMP to analyze dataset with missing data smoothly (should be achievable I believe)?
Thank you!


