New user here, previously used Minitab.
I'm having a strange issue where, after I generate an IR chart with process capabilities calculated and I save the report, when I reopen the report later on, "control chart sigma" becomes "specified sigma." Moreover, the control limits on the control chart are somewhat different from before the save event. If I try saving to a journal I get the same problem. Anyone seen this before? Am I doing something wrong? My JMP version is 9.0.0.
Thank you!
Patrick