Hello,
I'm new to JMP and I am hoping that someone here can help me with this question about DOE.
I created a screening design with a two-level factor. But one of these factors are complicated to stabilize. I had lots of differents levels for the factor.
I enter the real level in my design table and I run the model script (screening).
In scaled estimates, nearest the factor (term) , there are levels I wanted. My question is :Estimation are determined with real levels or levels I wanted?
Sorry for my english.
Thank you.