Hi,
More of a general statistics question than JMP per se but I thought worthwhile to get some opinions.
I'm looking at doing some MDL (Method Detection Limit) by spiking samples at different levels. The data from the line allows me to make a regression and I use the data from the line to calculate my MDL and the linearity of my data. It is not possible to do more than12 points (though I would love to)
Up till now, I have been doing 4 levels in triplicate - 12 points (say 0, 5, 10, 15). However it not more beneficial to do 6 levels in duplicate? I would think that you get more data on the regression and you can still get standard deviation with respect to the line.
Thanks