I used categorical factors in a screening DOE such as 60min_at_70C or 30min_at_90C. In the next DOE I'd like to explore each factor (time, temp.) as continuous factors. Since time and temperature are linked to rate of reaction, I would like to constrain the times at each temperature. For example: 30-60min at 70C and 10-30min at 90C. Is there a simple way to do this in JMP and maintain continuous factors?