Update - The videos recorded in EBC 9 are now available in the Technical Reference Library:
Relevance, Brevity, Simplicity and Impact
Driving upgrades and JMP Discovered
Please review the attached joining instructions (and JMP Table), both updated on 12th January. The 'food bank' commitment takes more time than I was expecting. Additionally, we have to be done by 1700, so the presentations have to be reduced from ten to seven minutes. So please note the final, final timings. A side effect of this is that we have had to consolidate some teams (also to reflect who will actually be available). Teams that have been affected by this are shown with a row state in red in the JMP table.
Teams 1 to 8 (9 to 16) will be in EBC 9 (EBC 8), and for convenience the 'voting' links are duplicated here:
Rate presentations in EBC 9.
Rate presentations in EBC 8.
On the day, the JMP table will be updated to show the assignment of 'topics' to 'teams'.
Finally, please note that there will be an additional session (for SEs only, not Enablement) from 1030 to 1130 in EBC 9. Details will be in a separate email.
Safe travels to Cary,
Ian