Title: C31 Optimizing a Continuous Process
Author: Phil Kay
Enclosed: I have a demo for adding to the technical reference library. It is on a continuous process. There is a data table and a brief slide to introduce the situation.
Why Good: I think it is a useful demo for predictive modeling and JMP Pro, especially in a chemicals or biotech situation.
The system behaviour is non-linear. There are many variables and unknown time lags between each variable and the response. Finding behaviours with standard time series analysis will be very challenging. So the approach is to create a range of lag variables for each original variable and then throw them all into a BF or NN. In JMP13 you can create lag these variables very easily.
Attachments:
- Continuous Process 100628.pptx
- Continous process data log.jmp