Dear All, I have a question concerning linear programming in JMP. The problem how I can set up a model for finding the optimum mixture with a constrain. I have let say 5 materials (A, B, C, D, E) for selection and each material has 2 properties. (p1, p2). So I have A(p1,p2), B(p1,p2), … My goal is to find the best mixture (a.A +b.B + c.C + d.D +e.E ) where (a, b, c, d, e) are the amounts of the given materials to match my wanted 2 properties (wp1, wp2). The constraint is now that I only want to use 2 materials for the mixture, or maximum 3 materials. It’s quite easy to solve this problem with Oracle Crystal Ball in Excel via Monte Carlo method, but I couldn’t set up this in JMP. Thank you Heinrich.