· Applied Materials:
o 12/08/15- JMP Visit - Miller Allen – Core Technology Team – AMAT AGS – Santa Clara, CA
§ Background:
· Dan and Don met with Miller Allen
· Miller and Sandeep are members of the Core Technology Team
· Need to align ourselves with this group (10-12 in this group)
§ Opportunity:
· Zhen Wang – Key technical advisor for this team Opportunity to look at Neural Nets for marathon operational measurement studies (chamber type signals, etc.) using JMP for process capability & modeling analysis (Trees & Neural Nets)
· 10-12 in this group
· These results used by Quality and Reliability (Q&R) Group as a statistical check for setting the specifications
§ Next Steps:
· Dan to get introduction from Miller into head of the Q&R Team (Sheryl Lewis)
Attachments: Fwd- Meeting with JMP -follow up.eml (Notes on follow-up for Zhen Wang's JMP Project)