Is it possible to label the calculated control limit values and mean lines directly on a control chart? I realize the information is reported in a table, but I'd like the lines on the plot to be labeled with this information.
I used the annotate tool with the phase to accomplish the following.
In the Analyze>Quality & Process>Control Chart platform the UCL and LCL are labeled.
Hi,
Thanks for your response. I should have clarified, I have my data organized by phases. I would like to have the value of the limits and means displayed for each phase. This is not a default setting, I have not been able to find a setting or script that will accomplish this - I am new to JMP though.
Thanks!
Jackie
That is helpful, but because I have over 100 plots to make on a regular basis it is a lot of manual work. Do you know of a command that will report the value for the LCL or UCL in the annotation boxes? Or, is there another way to do this in a more “automated” approach?
Thanks,