hi everyone.
i'm interested in knowing what the workflow is in arriving at a Reduced Model in JMP 12.
this might be of help in explaining where i'm coming from - i was taught data analysis using Minitab. in six sigma black belt class (and also reinforced as a method at work), it was taught (and practiced) that to get the Reduced Model (for continuous variables) using the principle of Parsimony we have to:
1.) fit a regression model with all factors
2.) remove factors with VIF >= 5
3.) perform best-subsets approach
4.) select subset/s with Mallows' Cp statistic < (k+1)
5.) select subset/s with high R-Sq(adj)
6.) select the simplest model with the fewest possible number of variables that can adequately explain the variation (figure below).
in our manual, the procedure above is titled "Steps Involved in Model Building".
is this workflow doable in JMP 12? how?
i know that JMP has its own procedures on Model Building. i'm currently reading and doing walk-throughs via the Visual Six Sigma book (currently @ Chapter 6) and by watching Building Better Models and other resources.
appreciate all the guidance as i transition to JMP.
- Randy, JMP newbie
