I have a table which gives the dates and times when changes were implemented which are roughly a week apart. I have another table of data with much finer times (on the order of minutes) which I’d like to join to the first table. How can I get the proper change level to be listed in a row which doesn’t have the same date/time?
For example, Table 1 could list change level 1 as happening on March 1 at 1:00 PM and change level 2 happening on March 8 at 6:00AM. Table 2 might have data on March 3 at 3:30 PM. I'd like to join the tables such that the row in Table 2 listing March 3 at 3:30 PM also lists change level 1.