Hi!
I wonder if it is statistically ok to repeat the "Make model using VIP" button-step in building a PLS model?
Say I have 30 variables in my original model, and 15 of them turn out to be above the treshold line, so I select "Make model using VIP", and get a new model with the 15 that were above the line. Altough, in my new model, there are 12 that are above the line and 3 that are below. Can I repeat the "Make model...".-step until I have a model wilth only VIP values above the treshold or can I only do it one time?
Hoping for a fast reply,
Sebastian Olofsson